I get my apartment to be installed with concrete table top because I believe concrete table top is long lasting compared to normal table top like IKEA. It is really water proof.
My contractor started to work on it on 7th November and got it completed by 25th December 2021. Actually they just work on Sunday as my contractor did it on part time basis.
So basically they did it on 7, 14, 21, 28th November and continued on 5, 12 & 25th December. They didn’t work on 19th December due to big flood at Shah Alam area.
In total it took 7 days to complete the kitchen concrete table top.
Remove Old Kitchen Cabinet
Making its Pillar Using White Bricks
I use my Alza to carry 60 white bricks and did few trips carrying the white bricks as it requires 146 bricks.
It is using 108 white bricks.
Making Wooden Frame To Pour Concrete
Installing Tiles After The Concrete Has Dried
Tiles Used
I buy the tiles at Yi Sheng at Kampung Melayu Subang.
Completed Table Top
After all tiles are installed, it is time to install the sink, kitchen hob and kitchen hood.
Total labour costs only (without cement tiles etc): RM2,500